Lim Seong Hai Logo
Lim Seong Hai Capital Berhad

LSH Capital Gets Nod to Build, Operate RM1.75bil Bandar Malaysia - Seri kembangan Expressway

LSH CAPITAL ELEVATES INTO NEXT PHASE AS INFRASTRUCTURE CONCESSION OWNER Kuala Lumpur, Thursday, 10 September 2026 – Lim Seong Hai Capital Berhad (“LSH Capital”) today announced it had received a letter from the Government of Malaysia (“GoM”), through the Ministry of Works, informing that the Cabinet of Malaysia had agreed-in-principle to the implementation of the proposed Bandar Malaysia-Seri Kembangan Expressway (“BSE”) under a privatisation arrangement based on a build-operate-transfer model.

Articles in English

    NST Logo

    LSH Capital gets nod to build, operate RM1.75bil Bandar Malaysia-Seri Kembangan expressway

    The Edge Malaysia

    Bandar Malaysia-Seri Kembangan Expressway to cost RM1.75 bil with 60-year concession, says LSH Capital

    Bandar Malaysia-Seri Kembangan expressway to cost RM1.75bil

    LSH Appointed To Construct RM1.75 Billion BSE Under Build-Operate-Transfer Model

    Article

    Malaysia Approves RM1.75 Billion Bandar Malaysia-Seri Kembangan Expressway

    The Ledger Asia logo

    LSH Capital Moves into Infrastructure Concessions with RM1.75 billion Expressway

    LSH Capital gets in-principle Cabinet approval for RM1.75b BSE highway project

Articles in Malay

    arrow up on a chart. arrow is green colour

    Kos lebuh raya bertingkat BSE dianggarkan RM1.75 bilion

    Berita Harian

    Kos lebuh raya bertingkat BSE dianggarkan RM1.75 bilion

Articles in Chinese

    SinChew Logo

    成本17.5亿 特许经营期60年 林上海资本获BSE大道工程

    8.2公里大道耗资17.5亿 林上海资本获原则批准建BSE

    林上海资本 获准开发BSE大道